Step 1: Prep the Floor
MVP is a low-maintenance finish, meaning it requires only the standard preparation most facilities already do.
- Clean: Thoroughly clean the floor surface.
- Abrasive Prep: Perform a light screening or abrasive pad clean. This provides a clean, roughed-up surface for the new finish to bond perfectly.
- Vacuum and Tack: Vacuum all dust and wipe down (tack) the floor with a clean cloth.
Step 2: Apply the MVP™ Finish
This is where MVP's single-component simplicity shines.
- Open and Stir: MVP is a single-component formula. There is absolutely no mixing of activators or hardeners required. Just open the container and stir thoroughly.
- Apply with an Applicator: Using a clean, professional finish applicator (like a T-bar), start at one end of the court and apply a smooth, uniform coat, moving toward your exit.
- Simple Tool Cleanup: Immediately clean your tools with soap and water—no harsh chemical solvents needed!
Step 3: Fast Recoat and Finish (Three Coats in One Day)
Forget waiting overnight between coats. MVP's fast-drying formula lets you complete the entire job quickly.
- Rapid Recoat: Wait just 1.5 to 2 hours for the first coat to dry.
- Repeat: Repeat the application process for your second and third coats. The fast turnaround means you can apply all three coats in a single day.
Step 4: Back in Play
Because MVP is low-VOC and utilizes our PolyWhey® technology, your facility is ready sooner.
- Low-Odor Convenience: The low-odor formula eliminates the need to shut down surrounding areas, keeping your facility running.
- Fast Curing: Your floor is protected with superior durability, ready for the action to resume quickly.